add wishlist add wishlist show wishlist add compare add compare show compare preloader

24/7 LIVE customer service

FREE U.S SHIPPING ON ALL ORDERS *

CALL NOW +1 (305) 999-5212

* within the 48 contiguous United States

excluding Generators / Gyros / Water Makers

Vetus T110-110L - Temperature sensor T=110 C, bracket angled at 110 degrees, long lead

SKU: T110-110L
$75.00
Save

🚚 FREE SHIPPING INCLUDED 🚚

Low in stock
Pre-order
Discontinued
In stock
Out of stock
Notify me When Available
You will receive an email when the product is available.

Vetus T110-110L - Temperature sensor T=110 C, bracket angled at 110 degrees, long lead

SKU T110-110L
Product type Manoeuvring Systems
List price
Sale price
$75.00
Date Created 28 / 11 / 2026

Product details

Product details

Print friendly

Download this print friendly page


Shipping & Returns

Shipping within the US

Promotional Shipping (e.g., free shipping*) is only applied to orders shipped within the contiguous United States and does not apply to Alaska, Hawaii, Puerto Rico or the US Virgin Islands. All shipments to Alaska or Hawaii and any other territories under the control of the United States may incur additional shipping charges based upon the location, weight and dimensions of the package once secured for shipment. Due to the distance of the above mentioned locations, please be aware that shipments may take a minimum of 5 business days to arrive. 
* Free Shipping covers up to $300 of freight.

⚠️NO RETURNS ON ELECTRONICS ⚠️

Expedited shipping costs provided by MMarine are only an estimate. You will be notified if the actual shipping cost exceeds the estimated shipping cost. We will never charge an increased shipping fee without your consent! 

*Free Shipping covers up to $300, Should shipping expenses exceed this amount, you will be notified prior to fulfillment

International Shipping

If your shipping address is located outside of the US, additional tax duties beyond our control may apply to collect your order upon delivery. Please be advised that shipping charges displayed on our website DO NOT INCLUDE customs, duties, or brokerage and import fees. Since these additional duties are unforeseen and unassociated with MMarine Online, it's the recipients responsibility to pay all applicable duties, taxes and brokerage fees that may apply upon the delivery and/or collection of your order. 

 

The international shipping fees shown on our website serve as estimates only. Should the actual shipping cost surpass the estimated amount, we will promptly inform you. Rest assured, we will never impose additional shipping charges without obtaining your consent beforehand!


Returns

 

A 25% RESTOCKING FEE WILL BE APPLIED TO ALL RETURNS. Returns made within 30 days of the purchase date will be refunded to the original form of payment. Any returns initiated beyond 30 days of purchase will not be accepted. NO EXCEPTIONS. We reserve the right to refuse returns or assess additional fees at our discretion based upon the condition of the item(s) returned. ALL HIGH TICKET ITEMS ARE FINAL SALE. NO RETURNS, NO EXCHANGES.    

 

If you need to return an item, please Contact Us with your order number and details about the item. We will respond with instructions on how to return the item(s). Please ensure the item(s) are returned in its original packaging and properly secured for return shipment. Insurance MUST be applied to your return and tracking information of your return must be supplied to MMarine Online via email at info@mmarineonline.com

 

Damages

We thoroughly inspect each item(s) prior to shipment to ensure and guarantee that the item(s) is free of any cosmetic damages and/or missing parts. While we take extra measures to ensure safe and secure shipment of your product, issues during shipment - while rare - are possible. 

Upon receiving shipments from MMarine Online and our partner shipping carriers, it is critical that you IMMEDIATELY inspect the package for damage PRIOR to signing for it and before accepting delivery from the carrier. If any damage is present, it MUST be noted on the carriers slip and reported to MMarine Online IMMEDIATELY. If damage is discovered after accepting a shipment, it MUST be reported to MMarine Online within 72 hours of the delivery.
In the event that damage is reported beyond 72 hours of delivery, MMarine Online will not accept any responsibility in replacing and/or further servicing your order.

It is imperitive that you document the damage(s), this means photos of the exterior of the box MUST be supplied along with photos of the visible damage(s). It is crucial that ALL packaging- the bubble wrap, the box and pallet be saved, as required by the insurance company to file and successfully submit a claim of damage.

We will replace defective products with an exchange for the same model and style ONLY.

If your parcel is left without a signature and damage is found, please contact us within 48 hours at (305)999-5212 or via email at info@mmarineonline.com. Your package should be unopened, unused and remain in the condition in which it was delivered until you successfully report a claim with MMarine Online.

 

Return on Electronics - Serial Number Policy

On returns of all electronics, serial numbers must match with serial number of product originally shipped and will undergo inspection; if serial numbers are not matching, a refund will not be issued.

 

Warranty

All warranty claims should be made directly with the manufacturer.

Should you require any assistance, we're more than happy to help establish contact with the manufacturer to assist you with the initiation of your claim and/or inquiry. If you require further support please call (305) 999-5212 or email us at INFO@MMARINEONLINE.COM 

Reviews

My offers